The Town of West Bridgewater seeks solutions to address the growing demand for classroom space by building a new school or renovating and expanding existing facilities. The increase in the number of homes and apartments being built in town is projected to add over 25% in student population, primarily impacting the elementary schools. The total grades K through 6 enrollment reported by the District for the 2022-2023 school year was 725 students.
As a result of the analysis conducted on the base enrollment forecast and the historical enrollment trends of the District, the Massachusetts School Building Authority recommends the following projected enrollment for planning the proposed project:
- Grades 1 through 3: 455 students
- Grades K through 4: 750 students (plus pre-K students)
- Grades 1 through 6: 930 students
- Grades K through 6: 1,075 students (plus pre-K students)
Project objectives include the identification of community concerns that may impact potential options, as well as specific milestone requirements or constraints for the District. Alternative sites will be considered as well as the evaluation of the life cycle costs of operating the school in relation to future operational budgets. Other factors include the Northeast Collaborative for High Performance Schools (NE-CHPS) criteria or the US Green Building Council’s LEED for Schools (LEED-SJ) Rating System. The CM-at-Risk delivery method will also be explored as part of the process. The estimated total project costs of an approved project may range from $100,000,000 to $200,000,000.
Potential school consolidation focuses on the priority school, the Rose L MacDonald School which is serves grades 1-3 and the Spring Street School which houses grades PreK-K and the Central Office Staff.